Cashmere EstateCCL are the lead contractor for the $80 million, 380 lot development in Cashmere and Worsleys Valley, Christchurch. Stage 1 was completed in 2018. The works involve bulk cut to fill earthworks, and the construction and installation of infrastructure such as carriageways, footpaths, cycle lanes, retaining walls, berms, kerb and channel, control structures and drainage.Visit the estate's site Curletts Road Flood Storage FacilityCCL completed the Curletts Road Stormwater Basins for the Christchurch City Council. It provides storage to manage storm events and mitigate the risk of flooding on the Heathcote River downstream. We moved 250,000 m³ of cut to waste and placed 70,000 m² of top soil, hydroseeded and completed the footpath construction. Chatterton Estate SubdivisionCCL was involved in the development of Chatterton Estate Subdivision in Hanmer, which consisted of 62 lots. The works involved bulk cut to fill earthworks, and the construction and installation of the carriageway and kerb and channel. TIL Freight YardThe construction of this carpark involved removing 10,000 m³ of existing failed seal, removing old kerb lines, basing up and prepping the large area ready for resealing. Over 2,000 m³ of metal was used to construct the basecourse. We finished the new asphalt surface with line markings for the trucks.
Have a project in mind?
Tell us about the work and we will get back to you within 24 hours.